Resources for Specifying and Reviewing Signage - Metroplus

Resources for Specifying and Reviewing Signage

Guides, templates and tools

Guides and technical references from Metroplus covering signage approvals, submission processes and specification standards across the UAE.

Guides & Resources

From our workshop

Metroplus technician assembling an illuminated channel letter in the Dubai signage workshop
Metroplus technician assembling an illuminated channel letter in the Dubai signage workshop
Metroplus technician drilling and assembling LED lighting components
Metroplus technician drilling and assembling LED lighting components
Technician fitting LED modules into a sign box at the Metroplus workshop
Technician fitting LED modules into a sign box at the Metroplus workshop

Mall Signage Approval Guide UAE

A practical walkthrough of how mall signage approvals actually work in the UAE: landlord tenant manuals, mall management submission steps, and how they differ from municipality signage rules from mall to mall.

Read the Mall Signage Approval Guide UAE →

Guides & Downloads

Practical, UAE-specific guides drawn from real mall, landlord and municipality approval work — use them to plan budgets, timelines and paperwork before you brief a signage contractor.

Mall & Retail Approvals

Permits & Compliance

Pricing & Procurement

Materials & Specification

Wayfinding

LED Illumination & Controls

Maintenance & Warranty

Vendor Selection

Need Expert Input Before You Commit?

If you have a specific project in hand — drawings, dimensions, or an approval requirement — request a technical signage review and get a written assessment of feasibility, materials, and budget range from our team before you request a full quote.

Tools and templates

For consultants and contractors

What to Prepare at Each Stage

Use these resources to prepare a signage submittal, check shop drawings and record approvals, then send your schedule for technical coordination.

Material records

Material, finish and supplier references recorded for each sign type.

Shop drawing checklist

Dimensions, fixings, illumination and access shown before approval.

Sample approval

Mock-ups reviewed and signed off against a written record.

Handover documents

As-built drawings, settings and warranty schedule issued at completion.

Tools and templates

Practical tools for consultants and facilities teams

Editable templates and a calculator you can use on your own projects.

Use the submittal pack to organise a tender or review, the approval record to document a mock-up, and the calculator to compare running costs.

Submittal templates

Editable schedules, BOQ and handover index.

Mock-up approval record

A blank record for materials, controls and approval.

Energy cost calculator

Compare options using measured power and your tariff.

Technical review

Send your schedule for a review by our team.

Specification

Build the Specification Around a Defined System

A sign specification should describe the complete assembly and the information needed to coordinate it. Start with the sign function and location, then record the face material, visible finish, mounting arrangement and any lighting or control requirements.

A generic detail is a starting point for coordination. The project team should confirm site dimensions, supporting construction, electrical interfaces and approval responsibilities before fabrication. Mark any unresolved item clearly so it is not treated as an agreed requirement.

Select

Specify

Tender

Approve

Maintain

Review my specificationSend your schedule and the relevant drawings. We will identify the questions to resolve before an itemised proposal.
Review my specificationSubmittal templates
Submit a sign schedule for reviewSend your completed sign schedule. Our team will review materials, drawings and sample requirements.
Submit a sign schedule for reviewContact us