For main contractors, developers, project managers and quantity surveyors
Bring the signage scope into one coordinated package before procurement gaps reach the site. Metroplus can review tender drawings, sign schedules and the BOQ to identify fabrication requirements, missing information and installation interfaces. Define the required design support, supply, installation and handover deliverables in the project proposal.
Images on this page are illustrative concepts, not completed Metroplus projects.
Establish a clear scope
Match each sign type to its location, quantity, material, finish and illumination requirement. Identify exclusions and responsibilities for power, structural supports, access, permits and making good. Where documents disagree, record a clarification rather than allowing a drawing assumption to become an unexpected site variation.
Agree samples and technical submissions
Set out the samples, shop drawings and material information required for review. A representative sample can help establish finish, lettering, lighting appearance and construction intent. Record the approved revision and any conditions before releasing repeated sign types into manufacture. Changes should remain traceable through the sign register.
Sequence manufacture with the project programme
Group signs around approved information and site readiness. Coordinate fixing locations and concealed provisions before finishes close off access. Where areas hand over at different times, identify release batches and outstanding approvals. Programme commitments should be agreed against the actual quantities, materials and installation conditions.
Close the package with useful records
Handover should identify installed sign references, approved drawings, relevant component details, maintenance guidance and the agreed warranty schedule. Capture unresolved items and the responsible party. Keep spare components and replacement artwork requirements visible so the building team can maintain the package after the construction team leaves.
Related services
Next step
Upload your BOQ and tender drawings. Share the information below so the proposed scope can address your actual project.
Helpful to include: Project type, consultant and main contractor, BOQ, drawings, required scope, procurement stage, programme, installation locations.
Recent Projects
Urban Outfitters, Yas Mall
Metroplus delivered the branding signage package for Urban Outfitters at Yas Mall in Abu Dhabi. The work spans the main fascia, department signage and interior feature signs.
Burger King, Ras Al Khaimah
Metroplus delivered a full exterior signage and lighting package for a standalone Burger King restaurant in Ras Al Khaimah. The building carries the brand on several elevations so it is visible from the road day and night.
We Offer