Healthcare Wayfinding and Safety Signage Project for Cosmomed Hospital
Healthcare signage and wayfinding system installation for Cosmomed Hospital in Fujairah.
Cosmomed brought Metroplus in to deliver hospital facade lettering at Fujairah. Cosmomed's logo and lettering crown a modern white facade.
Building-identity signage is planned from the elevations, with fixing, access and weatherproofing resolved before fabrication begins. Dimensional letters are CNC-cut and fabricated with clean returns, finished to the brand colour and mounted to a template so spacing and alignment stay exact.
Healthcare signage has to feel calm, clear and trustworthy. Names are kept legible, lighting is even and finishes are chosen to stay clean and professional over time.
Street-facing locations are exposed to sun, dust and humidity, so enclosures, finishes and lighting are specified for outdoor durability and straightforward long-term maintenance.
All fabrication for this project was carried out in-house at our Jebel Ali and Sharjah production facilities, from shop drawings through to on-site installation, so design intent, quality and programme stay under one roof.
How the project was delivered
- Scope
- Hospital facade lettering for Cosmomed in Fujairah, from shop drawings to installation.
- Design response
- Cosmomed's logo and lettering crown a modern white facade.
- Materials and build
- Dimensional letters are CNC-cut and fabricated with clean returns, finished to the brand colour and mounted to a template so spacing and alignment stay exact.
- Client
- Cosmomed
- Location
- Fujairah
- Sector
- Healthcare
- Scope
- Hospital facade lettering
- Delivered by
- Metroplus
Technology and fabrication
Wayfinding is designed around how people actually move through the space. Sign hierarchy, text size and placement are set for readability, then fabricated in durable materials with consistent finishes so the system reads as one family from entrance to destination.
- Clear sign hierarchy and legible typography
- Durable metal, acrylic and laminate construction
- Consistent finishes across the full sign family
- Site-surveyed positions and mounting details
How we deliver
- SurveySite measurement and brand brief.
- DesignShop drawings and visuals for sign-off.
- ApprovalsLandlord and mall submissions handled.
- FabricationBuilt in our Jebel Ali and Sharjah facilities.
- InstallationInstalled, tested and handed over.
Project gallery
Signage types in this project
Each type below links to the full service page with materials, finishes and the delivery process.
Related projects
Explore More
Seline Clinic, Umm Suqeim Dubai
Illuminated exterior and interior signage for Seline Clinic in Umm Suqeim, Dubai
Al Sharq Hospital, Dibba Al Fujairah
Healthcare Signage Solutions for Al Sharq Hospital – Dibba Al Fujairah
Dr. Nutrition, Reem Mall
Retail health and wellness store signage installation for Dr Nutrition at Reem Mall, Abu Dhabi.






